DETALHE DO PROJETO INDIVIDUAL

NOME: CONSTRUÇÃO DA PONTE DO RIO CORENTINE
CODIGO: GUY24
PAÍS:
GUYANA , SURINAME
FASE: PERFIL  
AMBIENTE: BINACIONAL
SECTOR: Transporte
SUBSECTOR: Rodoviário
TIPO DE OBRA: Pontes (novas e reabilitação)
A.P.I.: SIM  
ANCORA: NAO  
PROJECTO DE INVESTIMENTO TOTAL EM U$S: 1.000.000

Mapa

ÂMBITO DO PROJETO

OBJETIVO:

To eliminate bottlenecks and provide for 24 hour crossing of the Corentyne River.

DESCRIÇÃO:

To perform studies to construct a new bridge and/or improved crossing of the river.

PALAVRAS:

DESCRITOR
VALOR
UNIDADE DE MEDIDA
Ancho de bermas
 
m
Ancho de calzada
 
m
Ancho de plataforma
 
m
Derecho de Vía
 
m
Jerarquía de la vía
 
Red Nacional/Provincial/Municipal (km)
Longitud de vía
 
m
Número de carriles por vía
 
número
Número de vías
 
1 o 2
Puentes
 
cantidad
Puentes
 
m
Relieve
 
Llana (km)
Relieve
 
Montañosa(km)
Relieve
 
Ondulada (km)
Superficie actual
 
Carpeta/Tratamiento superficial/Hormigon/Ripio/ Tierra (ha)
Superficie de Rodadura a implantar
 
Flexible/Rígida
Transito medio diario anual
 
TMDA
Tuneles
 
cantidad
Tuneles
 
m
Viaductos
 
cantidad
Viaductos
 
m

SITUAÇÃO COMUM:

SITUAÇÃO GUYANA:

The Governments of Guyana and Suriname are to meet and discuss the modalities for the financing and execution of the Bridge Feasibility Study.

The Government of Guyana approved the sum of USD 1.2 million in the 2014 National Budget to carry out preparatory works for the approach roads to the proposed Bridge across  the Corentyne River.

A new administration was elected to office in Guyana in May 2015 and have determined bridging of the Corentyne River to be a priority.  Through the intervention of UNASUR in February 2016, Guyana has offered to prepare the Terms of Reference for the Feasiblity Study for a bridge across the Corentyne River.  Guyana awaits response from UNASUR or Suriname to meet and discuss the draft Terms of Reference that has already been prepared.

SITUAÇÃO SURINAME:

Jointly the Ministries of Foreign Affairs of Suriname and Guyana have requested Technical Cooperation from the Inter-American Development Bank  for funding of the Feasibility Study.

Modalities for financing of the execution are jointly being identified.

 

Riscos e ameaças

COMENTARIO

CUSTO DO E FINANCIAMENTO

NATUREZA: PÚBLICO
FONTE INVESTIMENTO (EN US$) STATUS DO FINANCIAMENTO
BID - PUBLICO 1.000.000 em processo
INVESTIMENTO TOTAL EN US$   1.000.000  

Incluídos no orçamento NACIONAL: Não especificado
ANO:
MONTO DE LOS ESTUDIOS EN US$:
FUENTE DE FINANCIAMIENTO DE LOS ESTUDIOS:

PROJETO STATUS DO MÓDULO

PROJETO PALCO: PERFIL  
DATA estimados de conclusão:
LICENCIA AMBIENTAL: NAO
ESTADO DE LOS ESTUDIOS:

RESPONSÁVEL informações de módulo

COORDENADOR NACIONAL GUYANA
  • NOME: ELISABETH HARPER
  • E-MAIL: eaharper@minfor.gov.gy
  • TELEFONE: (592) 225-7404
  • INSTITUIÇÃO: Ministry of Foreign Affairs

COORDENADOR NACIONAL SURINAME
  • NOME: ROBBY RAMLAKHAN
  • E-MAIL: buza@sr.net
  • TELEFONE: (597)424-708
  • INSTITUIÇÃO: Ministerio de Relaciones Exteriores
RESPONSÁVEL ULTIMA MODIFICAÇÃO GUYANA
  • NOME: Patrick Thompson
  • E-MAIL: pthompson@wsg.gov.gy
  • TELEFONE:
  • INSTITUIÇÃO:
  • DATA DE MODIF.: 02/06/2016 10:07:37

RESPONSÁVEL ULTIMA MODIFICAÇÃO SURINAME
  • NOME: santosh soman
  • E-MAIL: sosajo@yahoo.com
  • TELEFONE: +5977190015
  • INSTITUIÇÃO:
  • DATA DE MODIF.: 23/09/2013 16:16:08