To offer a renewable energy generation alternative to Guyana and alleviate the need to import oil products.
To build an hydroelectric power plant able to fulfill the national energy demand.
A contract has recently been awarded to Synergy Holdings Inc. at a cost of $US15.4M to construct the access road to the (1) hydroelectric dam site and to (2) to clear the transmission line corridor.