DETALHE DO PROJETO INDIVIDUAL

NOME: PORTO DE ÁGUAS PROFUNDAS NA GUIANA
CODIGO: GUY12
EIXO: DO ESCUDO DAS GUIANAS
PAÍS:
GUYANA
FASE: PERFIL  
AMBIENTE: NACIONAL
SECTOR: Transporte
SUBSECTOR: Marítimo
TIPO DE OBRA: Novos portos marítimos
A.P.I.: NAO  
ANCORA: NAO  
PROJECTO DE INVESTIMENTO TOTAL EM U$S: 0

Mapa

ÂMBITO DO PROJETO

OBJETIVO:

The main objectives of this project are:

1. To provide access to the Atlantic Ocean for the rapidly indutrializing states of Northern Brazil;

2. to enable access to large and gearless vessels, which would reduce transshipment costs and the overall ocean freight rates for imports/exports to/from Guyana; and

3. better enable Guyana to export its vast mineral resources.

 

 

DESCRIÇÃO:

It is being proposed to develop a deep water harbour with multiple berths, a Ship Dry Dock, and a special economic zone.

In the first phase, the harbour would be accompanied by a single, multipurpose berth to accomodate container vessels of Panamax size.

An area has been identified for this project at the mouth of the Berbice River, where there is adequate channel depth and the availability of a large tract of land.

PROJECTOS RELACIONADOS:

PALAVRAS:

DESCRITOR
VALOR
UNIDADE DE MEDIDA
Cantidad de posiciones de atraques
 
unidad operacional (sitio)
Descripción de la profundidad (calado), ancho de solera y longitud de los canales de acceso a profundizar y ensanchar
 
m
Descripción de los accesos a construir viales y ferroviarios
 
km
Expropiaciones necesarias
 
ha
Longitud del muelle
 
m
Metros lineales de las obras de protección
 
m
Superficie de zona de almacenamieto (tierra)
 
ha
Tipo de operación/administración del puerto
 
Público/Privado/ Público-Privado

SITUAÇÃO GUYANA:

A report on the "Construction of Deep Water Port at New Amsterdam, Berbice River of Guyana" has been carried out by a study team from the Ministry of Shipping of India.

The Governments of Guyana and Brazil have setup a Joint Working Group on Infrastructure that is currently discussing the modalities for the financing of a Deep Water Port at New Amsterdam.  A joint report with concrete actions and decisions is due to be completed by end of June 2013.

It is envisaged that a more comprehensive Feasibility Study and Designs will have to be done to establish costs and benefits to this project.

Riscos e ameaças

COMENTARIO

CUSTO DO E FINANCIAMENTO

NATUREZA: PÚBLICO
FONTE INVESTIMENTO (EN US$) STATUS DO FINANCIAMENTO
A DEFINIR 0 não iniciado
INVESTIMENTO TOTAL EN US$   0  

Incluídos no orçamento NACIONAL: Não especificado
ANO:
MONTO DE LOS ESTUDIOS EN US$:
FUENTE DE FINANCIAMIENTO DE LOS ESTUDIOS:

PROJETO STATUS DO MÓDULO

PROJETO PALCO: PERFIL  
DATA estimados de conclusão:
LICENCIA AMBIENTAL: NAO
ESTADO DE LOS ESTUDIOS:

RESPONSÁVEL informações de módulo

COORDENADOR NACIONAL GUYANA
  • NOME: ELISABETH HARPER
  • E-MAIL: eaharper@minfor.gov.gy
  • TELEFONE: (592) 225-7404
  • INSTITUIÇÃO: Ministry of Foreign Affairs
RESPONSÁVEL ULTIMA MODIFICAÇÃO GUYANA
  • NOME: Patrick Thompson
  • E-MAIL: pthompson@wsg.gov.gy
  • TELEFONE:
  • INSTITUIÇÃO:
  • DATA DE MODIF.: 22/04/2013 13:11:08