Pavimentação do trecho Bonfim - Normandia e construção das pontes sobre o Rio Arraia (BR-79) e Itacutu (BR-80), esta última na fronteira com a Guyana, To pave the existing road between Lethem (Guyana), located at the border of the Brazilian state of Roraima, to Linden. For the interconnection Boa Vista-Georgetown, the route is comprised of the following sections: Georgetown to Linden - This road is already paved to accommodate traffic at international standards; Linden to Lethem - 450 Km of gravel surfaced road which will require upgrading and will require the replacement of some 80 drainage structures. Two major river crossings are included in the project, including the bridge across the Demerara River at Linden, which is in reasonable condition, but only capable of accommodating one-lane traffic and will require extension, and the Kurupukari river mid-way on the route from Linden to Lethem; Lethem - Bonfim - Boa Vista: this section has already been completed by the Government of Brazil, except for the Bridge across the Takutu River on the border with Brazil, which is being addressed as a separate project by IIRSA.