DETALHE DO PROJETO INDIVIDUAL

NOME: PLANO MAESTRO INTEGRADO DE PROTECÇÃO COSTEIRA ALBINA - NICKERIE
CODIGO: GUY40
PAÍS:
SURINAME
FASE: PRE-EXECUÇÃO  
AMBIENTE: NACIONAL
SECTOR: Transporte
SUBSECTOR: Marítimo
TIPO DE OBRA: Ampliação da Infraestrutura Terrestre dos Portos Marítimos
A.P.I.: NAO  
ANCORA: NAO  
PROJECTO DE INVESTIMENTO TOTAL EM U$S: 3.020.000.000

Mapa

ÂMBITO DO PROJETO

OBJETIVO:

To ensure the wellbeing of the population of Suriname by protecting the fertile land for agriculture, urban areas and livestock cultivation. Protection against the foreseen impacts of sea level rising due to the climate change. Also to create a Operation and Maintenance organization to continue the protection of said infrastructure, with training facilities for employees and students.

DESCRIÇÃO:

General
The need to protect the total coastline of Suriname against the foreseen sea level rise impact.
Technical
In the ocean in front of the coast of Suriname moving mud banks pose an integral part of the coastal protection. These moving banks provide form a natural protection if present. Currently, with a cycle of 30 years, if not present the coastline is subjected to erosion. With the rise of the seawater levels this erosion will be enhanced along the coastline. The impact on the population, livestock, flora as well as land loss and degradation will be evident. As part of the defense works a new northern road corridor from Albina to Nieuw Nickerie will be created.

PROJECTOS RELACIONADOS:

PALAVRAS:

DESCRITOR
VALOR
UNIDADE DE MEDIDA
 
 
 
 
 
 
 
 
 
 
Tipo de operación/administración del puerto con proyecto
 
Público / Privado / Público-Privado

SITUAÇÃO SURINAME:

Tender documents of existing projects will to be evaluated. Additional measures including sea defense works need to be re-engineered

Riscos e ameaças

COMENTARIO

Preparatory works are being done to start up the tender of this phase.
Value (US$): 1,000,000.00

CUSTO DO E FINANCIAMENTO

NATUREZA: PÚBLICO
FONTE INVESTIMENTO (EN US$) STATUS DO FINANCIAMENTO
A DEFINIR 3.020.000.000
INVESTIMENTO TOTAL EN US$   3.020.000.000  

Incluídos no orçamento NACIONAL: Não especificado
ANO:
MONTO DE LOS ESTUDIOS EN US$: 90000000
FUENTE DE FINANCIAMIENTO DE LOS ESTUDIOS: A DEFINIR

PROJETO STATUS DO MÓDULO

PROJETO PALCO: PRE-EXECUÇÃO  
DATA estimados de conclusão:
LICENCIA AMBIENTAL: NAO
ESTADO DE LOS ESTUDIOS:

RESPONSÁVEL informações de módulo

COORDENADOR NACIONAL SURINAME
  • NOME: ROBBY RAMLAKHAN
  • E-MAIL: buza@sr.net
  • TELEFONE: (597)424-708
  • INSTITUIÇÃO: Ministerio de Relaciones Exteriores
RESPONSÁVEL ULTIMA MODIFICAÇÃO SURINAME
  • NOME: santosh soman
  • E-MAIL: sosajo@yahoo.com
  • TELEFONE: +5977190015
  • INSTITUIÇÃO:
  • DATA DE MODIF.: 25/08/2011 07:48:51